Mining Service Project
Planning Phase
Site Visit and Visual Inspection
Proposal of Engineering Drawing
Estimation of Project Duration
and time
Risk and safety assesment
Resource Management
Budgeting
Aquisition and transportation of
materials and equipment
Approval Phase
Approval of Engineering
Drawings and Design
(internally and with
licensed third part)
Approval of Aquisition
Approval of Budget,risk assesment,
resource management and project
timeline
Approval of HSE and Licenses
Mine Preparation Phase
Clearing mine of any obstacles
that hinder unloading and
installation of components
Clearing mine for easy access
and work space for labourers
Prepare pathways for daily
mining operations
Safety checks of pathways
and preparation of equipment
base site
Construction of base for
pumping setup
Installation of safety
equipment
Measuring and mapping of
area for equipment placement
Execution Phase
Unloading the equipments
and components on site
Lowering the equipments
into mine
Transportation of equipments
to the planned location on site
Installation of wiring ducts
and completion of wiring
Installation of plumbing lines,
valves and NRV
Setup of pumps
Design of sumps using
Mini excavator/Muki
Concreting of sump
Overall Testing
and Licensing Phase
Testing of pumps
and water lines
Licensing of setup by
third party contractor
or Industry expert
Delivery Phase
Handover of setup
to client
Handover of
technical documents
Closing the finance
account
Feedback from
employees
Receiving approval
from clients.