SMB Management Systems that should be subject to Quality Management & Audit. Site Manager/IPL and PM are sample comments from the construction team respondents.
Commercial
Processes
Yes SMB Level / Eight2O Level
Guidance
Yes Guidence in place
Forms
Ian mason was working with Nick to populate Commercial Handbook
Location
ARM/Cemar/ Twexnet/Symbiosis/IFS
Defects Pre and Post TOC
Processes
No
Guidance
No
Forms
No
Location
BIM 360 Field
Design
Processes
Eight2O Navigator No Official Process
Guidance
Presentations and Navigator / Power point presentation
Forms
Yes Located on Twexnet
Location
Project Wise/ Twexnet/ Stantec Global Share Point/ Symbiosis
IPL5
Processes
Yes But only used for Gateways and to ensure right governance
Guidance
Yes But not used at this level
Forms
Yes But To bulky and a lot of information in the works order
Location
Twexnet / Symbiosis/ARM/Cemar/PIM
H&S
Processes
Yes Process in Place Using Active She / Open Access
Guidance
Yes Guidence on Active She / Open Access
Forms
Yes on Active She / Open Access
Location
Active She / Open Access / Twexnet
Procurement
Processes
Yes Process in place
Guidance
Yes giudence Notes Avalible but not Stored on Navigator
Forms
Yes Forms in place but not stored on Twexnet
Location
IFS / Symbiosis / Twexnet
Estimating
Processes
Yes Pre Construction Gov Process
Guidance
Yes Level 4
Forms
Yes Magic 6
Location
Symbiosis / Twexnet
IPL4
Processes
Yes Subject to change (Process has changed in the last 5 years) No Formal Process
Guidance
YES Documentation Keeps Changing and Being Re Revised no Clear Communication
Forms
YES forms keep changing a lot of Duplication of information, need to be kept up to date and simpler and easier to use
Location
Twexnet / Symbiosis/ARM/Cemar/PIM
Archiving
Processes
No
Guidance
No
Forms
No
Location
No
IPL3
Processes
Yes Process in Place - Navigator
Guidance
No
Forms
Yes Forms on Twexnet
Location
Twexnet / Symbiosis/ARM/Cemar/PIM
IPL2
Processes
Yes Not Streamlined and Has Not Been Adequately Disseminated, No Comprehensive Formal Instruction on the Use of Comprehensive Business processes
Guidance
Yes not streamlined and documentation communication, if the process has changed no formal communication down to the project teams
Forms
Yes forms keep changing a lot of Duplication of information
Location
Twexnet / Symbiosis/ARM/Cemar/PIM
Financial
Processes
Yes Process in place
Guidance
yes on symbiosis
Forms
No Forms used
Location
Symbiosis / IFS
PM 1
Processes
No, people have followed what they have done before and good customer practice, Processes not Clearly defined. Documentation and Communication not disseminated.
Guidance
Yes guidance notes need to be improved, Training workshops needed Training with project teams.
Forms
Yes Training needed on the use of forms and workshops.
Location
Twexnet / Symbiosis / Rag
Site Manager 1
Processes
Chris Lee Has Made a Site managers Check list to Carry out his Roles and Responsibility's as nothing is Documented, When Setting up a Site Chris Uses own Experience and using site set up checklist. NO Site Hand Over Procedure to site manager, Somebody to issue out changes to any rules or Regulations that have changed So we are not operating out SMB rules. Drawing Register to be More Visible to SMB Site Teams
Guidance
Guidance forms on Active SHE
Forms
There are a lot of Check lists but there Very Generic and no suited for all sites
Location
Send to Doc Control and Add to Twexnet
Site Manager 2
Processes
No Process in Place, Using Own Experience to do day to job . And no training in the process, Roles and responsibilities should be defined and Training in what is expected, need a well defined archiving Procedure, with what we need keep at the end of the project, Safety Department Leading them self's new safety initiatives need to be reviewed to suit SMB Procedures before being rolled out
Guidance
Need Additional Training, on Guidance and showing people were its located on Open Access, need to show people what the procedures mean and how they work and then reference open access, (REALLY IMPORTANT FOR NEW STARTS )
Forms
Forms Need to looked at against GBMs Form and take the best from both Systems, and Stream Line Forms and Communicate any Changes to forms, Updates need to be Sent to people and changed every quarter if needed, Emergency revision as Required.
Location
Active SHE / BIM 360 / Twexnet/ Symbiosis
Note
New Starters Not Getting Adequate Training in SMB Process and Procedures
Construction & Commissioning ITPs (Site and Commissioning Teams)
Processes
NO Process in place for the Compilation and Acceptance of ITPs
Guidance
No Guidence in place
Forms
MWH ITP in place But uncontrolled and not stored in a central location
Location
BIM 360 Field
Enviromental Waste Transfer Notes (Skanska UK)
Processes
subcontractor Aproach Document
Guidance
Yes
Forms
Environmental Report / Environmental Audit / active SHE
Location
Site Files data loaded on to Active SHE
Information Management Systems
TWEXNET
Project Wise
Symbiosys
Autodesk
Open Access
CEMAR
PIM
ARM
Parent Company Intranet
P6 Planning
IFS
Timesheets
Agency
Parent Company