Giza Palace Hotel and Spa (GPHS)
Engineering Design
& Approval
Site Preparation
Procurement
construction
Phase 1
Remaining of Building 1
Arch. Work
Unit Masonry Assemblies
Basement 3
Basement 2
Basement 1
Ground Floor
Mezzanine Floor
1st Floor
2nd Floor
3rd Floor
Cement Plaster
Internal plaster
Basement 2
Basement 3
Basement 1
Ground Floor
Mezzanine Floor
1st Floor
2nd Floor
3rd Floor
External Plaster
Struct. Work
Soil Replacement below SOG
Concrete
Sub Structure Works
SOG 200 mm
Super Structure Works
4th Floor
Domes
Masonry Under SOG
Sub Structure Water Proofing
Electric Works
Rough In
Install and Terminate
Electromechanical Works
HVAC
Outside Units
AHU
Inside Units
Boiler
Chiller
Pipes Network
Rough In
Install and Terminate
Thermal Insulation
Ducts
Square ceiling diffuser
Control System
Fire Fighting System
Smoke Detectors
Pumping System
Pipe Network
Remaining of Building 3
Remaining of Building 4
Remaining of Building 6
Building 7 till 3rd floor level
Struct. Work
Soil Replacement below SOG
Concrete
Sub Structure Works
SOG 200 mm
Super Structure Works
2nd Floor
3rd Floor
Masonry Under SOG
Sub Structure Water Proofing
Arch. Work
Unit Masonry Assemblies
Ground Floor
Basement 3
Basement 2
Basement 1
Mezzanine Floor
1st Floor
2nd Floor
Cement Plaster
Internal plaster
Ground Floor
Basement 3
Basement 2
Basement 1
Mezzanine Floor
1st Floor
2nd Floor
External Plaster
Building 8 till 3rd floor level
Struct. Work
Soil Replacement below SOG
Concrete
Sub Structure Works
SOG 200 mm
Super Structure Works
2nd Floor
3rd Floor
Masonry Under SOG
Sub Structure Water Proofing
Arch. Work
Unit Masonry Assemblies
Ground Floor
Basement 3
Basement 2
Basement 1
Mezzanine Floor
1st Floor
2nd Floor
Cement Plaster
Internal plaster
Ground Floor
Basement 3
Basement 2
Basement 1
Mezzanine Floor
1st Floor
2nd Floor
External Plaster
Building 9 till 3rd floor level
Struct. Work
Soil Replacement below SOG
Concrete
Sub Structure Works
SOG 200 mm
Foundation
Basement 2
Basement 1
Super Structure Works
Ground Floor
1st Floor
2nd Floor
3rd Floor
Mezzanine Floor
Masonry Under SOG
Sub Structure Water Proofing
Arch. Work
Unit Masonry Assemblies
Ground Floor
Basement 3
Basement 2
Basement 1
Mezzanine Floor
1st Floor
2nd Floor
Cement Plaster
Internal plaster
Ground Floor
Basement 3
Basement 2
Basement 1
Mezzanine Floor
1st Floor
2nd Floor
External Plaster
Remaining of Building 10
Struct. Work
Soil Replacement below SOG
Concrete
Sub Structure Works
SOG 200 mm
Super Structure Works
4th Floor
5th Floor
Domes
Masonry Under SOG
Sub Structure Water Proofing
Arch. Work
Unit Masonry Assemblies
Basement 3
Basement 2
Basement 1
Ground Floor
Mezzanine Floor
1st Floor
2nd Floor
3rd Floor
4th Floor
Cement Plaster
Internal plaster
Basement 3
Basement 2
Basement 1
Ground Floor
Mezzanine Floor
1st Floor
2nd Floor
3rd Floor
4th Floor
External Plaster
Remaining of building 11
Struct. Work
Soil Replacement below SOG
Concrete
Sub Structure Works
SOG 200 mm
Super Structure Works
3rd Floor
4th Floor
5th Floor
Domes
Masonry Under SOG
Sub Structure Water Proofing
Arch. Work
Unit Masonry Assemblies
Basement 3
Basement 2
Basement 1
Ground Floor
Mezzanine Floor
1st Floor
2nd Floor
3rd Floor
4th Floor
Cement Plaster
Internal plaster
Basement 3
Basement 2
Basement 1
Ground Floor
Mezzanine Floor
1st Floor
2nd Floor
3rd Floor
4th Floor
External Plaster
Phase 2
Phase 3