door Daniel Rincón 4 jaren geleden
356
Meer zoals dit
Assignment and control of personnel and equipment problems.
Dimensions of resources
Number of employees
System sizes
Storage
Selection of types of storage systems
Process design
Recognize the relationships between problems, to avoid suboptimal solutions
Solutions chosen at a higher level provide the limitations for lower-level design problems.