WestGrove Projects and Tasks
Organize Office
Discuss with the office about upgrading/replacing the computers that are running the Security cameras and Access Log system
Kathy is looking into the upgrades Feb.4
Need to purchase organizational materials for the office
New desk?
Amber was sent the dimension of the office Jan. 31
Finish the demo on the 4th floor
I will continue to work on the electrical demo in the ceiling
Some form of diverter or covers for the main electrical infrastructure in the basement in the event of flooding from the floors above
Told Bob; He isn't opposed to the idea, just not right now; $$$
Change out tiles on the two landings in the South stairwell
Will need to get more tiles from MMM/find more on site
Need to get glue
Organize Shop
Throw out all of the garbage
Need to see about getting a heater in that room
Need to throw out all of the garbage back by the second storage room
Need to build some kind of racking to store the piping and ducting being stored in the back corner
HVAC Upgrades
Need to get new controllers on the AHU's
Need to look at replacing/fixing the ductwork on the rooftop units
Need to separate the building into 4 zones and get the Stairwell radiators on the Building Hot loop
Simon needs to get a bypass on the radiators at his doors so that he has control
AHU#3 is not able to make duct stat setpoint despite having its fan on @ %100
Orientation and Acquisition
Create something that looks like a daily task list
Projects
Gas service upgrade for the building
Would like to explore the option of getting a CoGen on the rooftop once this upgrade has been completed
Contact ATCO and find out in writing exactly what is required for a service upgrade from 0.25psi to 2psi
BMA in the parkade
Need to find out where this project stands and what options or solutions are being explored
Is it an option to have the unit repaired?
Is it an option to add additional unit heaters?
- there is serious condensation in that one end of the parkade and no unit heater located near by: other areas are better and they do have a heater
Need to seal around the secondary exhaust fans
Need to look into the roof drain on fourth floor balcony
Amber gave me the quote from Fraser Bros. and plumber
Still waiting to hear from Amber about Kone
Want to look at changing the ballasts and bulbs in the parkade to T8 to improve the "dark" feeling
Repair Brick work around the building and look at finding some kind of sealer for the bricks prior to next season
Fix and replace the broken/damaged VCT in the Stairwell
Grab box of tiles today from mall
Find out about Boma courses; Luminaire service course; integrated controls course; and Schneider courses and get back to amber with costs etc.
Daily Task list
Property walk
Check stairwells
Walk perimeter
Check boiler rooms
Fill out boiler log
Pick up garbage
Walk parkade
RTU Checks
Check 3rd floor handicapped washroom
Turn on TV in the main lobby
Update the content for Simon