WestGrove Projects and Tasks

Organize Office

Discuss with the office about upgrading/replacing the computers that are running the Security cameras and Access Log system

Kathy is looking into the upgrades Feb.4

Need to purchase organizational materials for the office

New desk?

Amber was sent the dimension of the office Jan. 31

Finish the demo on the 4th floor

I will continue to work on the electrical demo in the ceiling

Some form of diverter or covers for the main electrical infrastructure in the basement in the event of flooding from the floors above

Told Bob; He isn't opposed to the idea, just not right now; $$$

Change out tiles on the two landings in the South stairwell

Will need to get more tiles from MMM/find more on site

Need to get glue

Organize Shop

Throw out all of the garbage

Need to see about getting a heater in that room

Need to throw out all of the garbage back by the second storage room

Need to build some kind of racking to store the piping and ducting being stored in the back corner

HVAC Upgrades

Need to get new controllers on the AHU's

Need to look at replacing/fixing the ductwork on the rooftop units

Need to separate the building into 4 zones and get the Stairwell radiators on the Building Hot loop

Simon needs to get a bypass on the radiators at his doors so that he has control

AHU#3 is not able to make duct stat setpoint despite having its fan on @ %100

Orientation and Acquisition

Create something that looks like a daily task list

Projects

Gas service upgrade for the building

Would like to explore the option of getting a CoGen on the rooftop once this upgrade has been completed

Contact ATCO and find out in writing exactly what is required for a service upgrade from 0.25psi to 2psi

BMA in the parkade

Need to find out where this project stands and what options or solutions are being explored

Is it an option to have the unit repaired?

Is it an option to add additional unit heaters?
- there is serious condensation in that one end of the parkade and no unit heater located near by: other areas are better and they do have a heater

Need to seal around the secondary exhaust fans

Need to look into the roof drain on fourth floor balcony

Amber gave me the quote from Fraser Bros. and plumber

Still waiting to hear from Amber about Kone

Want to look at changing the ballasts and bulbs in the parkade to T8 to improve the "dark" feeling

Repair Brick work around the building and look at finding some kind of sealer for the bricks prior to next season

Fix and replace the broken/damaged VCT in the Stairwell

Grab box of tiles today from mall

Find out about Boma courses; Luminaire service course; integrated controls course; and Schneider courses and get back to amber with costs etc.

Daily Task list

Property walk

Check stairwells

Walk perimeter

Check boiler rooms

Fill out boiler log

Pick up garbage

Walk parkade

RTU Checks

Check 3rd floor handicapped washroom

Turn on TV in the main lobby

Update the content for Simon

Check BMS

Check exterior and vestibule lights and radiators

Check all washrooms

Check emails