WBS
Retail Interior Design Website
1. Project Management
1.1. Business Case (link to the approved document)
1.1.1. gather the requirements
1.2. Project Charter (link to the approved document)
1.2.1. set the goal, objectives and scope of the project
1.2.2. project charter approval
1.3.Project Plan (link to the approved document)
1.3.1. make WBS
1.3.1.1. make the type of works list
1.3.2. make WBS Outline
1.3.2.1. estimate the cost (effort & duration)
1.3.2.2. make the Network Diagram
1.3.3. prepare Project Plan
1.3.3.1. estimate the cost
1.3.3.2. assess the risks
1.3.4. approve the project plan
1.4. Status Report (link to the document)
1.4.1. make the status report schedule
1.5. Final Report (link to the document)
1.5.1. make the Final Report
2. Recruitment
2.1 Development Team (full-time contracts)
2.1.1. identify the hiring need
2.1.2. plan the recruitment
2.1.3. search for talents
2.1.4. screen and make a short list
2.1.5. interview the candidates
2.1.6. offer a job and hire
2.1.7 onboard the new hires
3. Design & Analysis
3.1. Clickable Prototype (the link to the clickable prototype)
3.1.1. do the Project Kickoff
3.1.1.1. establish common goals and requirements
3.1.1.2. analyse the information and requirements
3.2.1. make up a website design concept
3.2.2. make a Clickable Prototype
3.2.3. approve the Clickable Prototype
4. Development
4.1. Graphical page templates (the link to the templates)
4.1.1. analyse the concept of the website
4.1.2. develop the structure of the pages
4.1.3. develop the server set-up
4.1.4. make graphical asset placement
4.1.4.1. make graphical splitting and optimisation
4.1.4.2. make template structure/coding
4.1.5. develop navigation
4.1.6. develop special feature coding
4.1.6.1. make widgets
4.1.6.2. make flash
4.1.6.3. make visual interior constructor
5. Testing
5.1. Testing Report (the document is on Google Drive)
5.1.1. make a plan of the testing
5.1.1.1. check the project requirements
5.1.1.2.estimate the risks
5.1.2. run the Testing
5.1.3. analyse the the results
5.1.4. make the report of defects for the Development Team
5.1.5. make recommendations for the quality improvement
5.1.6. correct the defects
5.1.7. run the Final Testing
5.1.8. approve the project rediness verification
6. Release
6.1. Website (the link to the website)
6.1.1. deploy the website
6.1.1.1. implement and launch the hosting
6.1.1.2. arrange the work of Customer Service