GPH total 111

Giza Palace Hotel and Spa is in the midst of its construction and procurement phase, focusing on both architectural and structural work across various floors and areas of the building.

GPH total 111

Giza Palace Hotel and Spa (GPHS)

construction

Phase 3
Phase 2
Phase 1
Remaining of building 11
Remaining of Building 10
Building 9 till 3rd floor level

Foundation

Building 8 till 3rd floor level
Building 7 till 3rd floor level
Remaining of Building 6

Roof Floor

Remaining of Building 4
Remaining of Building 3

5th Floor

Remaining of Building 1

Electromechanical Works

Fire Fighting System

Pipe Network

Pumping System

Smoke Detectors

HVAC

Inside Units

Control System

Square ceiling diffuser

Ducts

Pipes Network

Thermal Insulation

Chiller

Boiler

Outside Units

AHU

Electric Works

Install and Terminate

Rough In

Struct. Work

Sub Structure Water Proofing

Masonry Under SOG

Concrete

Super Structure Works

Domes

4th Floor

Sub Structure Works

SOG 200 mm

Soil Replacement below SOG

Arch. Work

Cement Plaster

External Plaster

Internal plaster

Unit Masonry Assemblies

3rd Floor

2nd Floor

1st Floor

Mezzanine Floor

Ground Floor

Basement 1

Basement 2

Basement 3

Procurement

Site Preparation

Engineering Design & Approval