SMB Management Systems that should be subject to Quality Management & Audit. Site Manager/IPL and PM are sample comments from the construction team respondents.

Commercial

Processes

Yes SMB Level / Eight2O Level

Guidance

Yes Guidence in place

Forms

Ian mason was working with Nick to populate Commercial Handbook

Location

ARM/Cemar/ Twexnet/Symbiosis/IFS

Defects Pre and Post TOC

Processes

No

Guidance

No

Forms

No

Location

BIM 360 Field

Design

Processes

Eight2O Navigator No Official Process

Guidance

Presentations and Navigator / Power point presentation

Forms

Yes Located on Twexnet

Location

Project Wise/ Twexnet/ Stantec Global Share Point/ Symbiosis

IPL5

Processes

Yes But only used for Gateways and to ensure right governance

Guidance

Yes But not used at this level

Forms

Yes But To bulky and a lot of information in the works order

Location

Twexnet / Symbiosis/ARM/Cemar/PIM

H&S

Processes

Yes Process in Place Using Active She / Open Access

Guidance

Yes Guidence on Active She / Open Access

Forms

Yes on Active She / Open Access

Location

Active She / Open Access / Twexnet

Procurement

Processes

Yes Process in place

Guidance

Yes giudence Notes Avalible but not Stored on Navigator

Forms

Yes Forms in place but not stored on Twexnet

Location

IFS / Symbiosis / Twexnet

Estimating

Processes

Yes Pre Construction Gov Process

Guidance

Yes Level 4

Forms

Yes Magic 6

Location

Symbiosis / Twexnet

IPL4

Processes

Yes Subject to change (Process has changed in the last 5 years) No Formal Process

Guidance

YES Documentation Keeps Changing and Being Re Revised no Clear Communication

Forms

YES forms keep changing a lot of Duplication of information, need to be kept up to date and simpler and easier to use

Location

Twexnet / Symbiosis/ARM/Cemar/PIM

Archiving

Processes

No

Guidance

No

Forms

No

Location

No

IPL3

Processes

Yes Process in Place - Navigator

Guidance

No

Forms

Yes Forms on Twexnet

Location

Twexnet / Symbiosis/ARM/Cemar/PIM

IPL2

Processes

Yes Not Streamlined and Has Not Been Adequately Disseminated, No Comprehensive Formal Instruction on the Use of Comprehensive Business processes

Guidance

Yes not streamlined and documentation communication, if the process has changed no formal communication down to the project teams

Forms

Yes forms keep changing a lot of Duplication of information

Location

Twexnet / Symbiosis/ARM/Cemar/PIM

Financial

Processes

Yes Process in place

Guidance

yes on symbiosis

Forms

No Forms used

Location

Symbiosis / IFS

PM 1

Processes

No, people have followed what they have done before and good customer practice, Processes not Clearly defined. Documentation and Communication not disseminated.

Guidance

Yes guidance notes need to be improved, Training workshops needed Training with project teams.

Forms

Yes Training needed on the use of forms and workshops.

Location

Twexnet / Symbiosis / Rag

Site Manager 1

Processes

Chris Lee Has Made a Site managers Check list to Carry out his Roles and Responsibility's as nothing is Documented, When Setting up a Site Chris Uses own Experience and using site set up checklist. NO Site Hand Over Procedure to site manager, Somebody to issue out changes to any rules or Regulations that have changed So we are not operating out SMB rules. Drawing Register to be More Visible to SMB Site Teams

Guidance

Guidance forms on Active SHE

Forms

There are a lot of Check lists but there Very Generic and no suited for all sites

Location

Send to Doc Control and Add to Twexnet

Site Manager 2

Processes

No Process in Place, Using Own Experience to do day to job . And no training in the process, Roles and responsibilities should be defined and Training in what is expected, need a well defined archiving Procedure, with what we need keep at the end of the project, Safety Department Leading them self's new safety initiatives need to be reviewed to suit SMB Procedures before being rolled out

Guidance

Need Additional Training, on Guidance and showing people were its located on Open Access, need to show people what the procedures mean and how they work and then reference open access, (REALLY IMPORTANT FOR NEW STARTS )

Forms

Forms Need to looked at against GBMs Form and take the best from both Systems, and Stream Line Forms and Communicate any Changes to forms, Updates need to be Sent to people and changed every quarter if needed, Emergency revision as Required.

Location

Active SHE / BIM 360 / Twexnet/ Symbiosis

Note

New Starters Not Getting Adequate Training in SMB Process and Procedures

Construction & Commissioning ITPs (Site and Commissioning Teams)

Processes

NO Process in place for the Compilation and Acceptance of ITPs

Guidance

No Guidence in place

Forms

MWH ITP in place But uncontrolled and not stored in a central location

Location

BIM 360 Field

Enviromental Waste Transfer Notes (Skanska UK)

Processes

subcontractor Aproach Document

Guidance

Yes

Forms

Environmental Report / Environmental Audit / active SHE

Location

Site Files data loaded on to Active SHE

Information Management Systems

TWEXNET

Project Wise

Symbiosys

Autodesk

Open Access

CEMAR

PIM

ARM

Email

Parent Company Intranet

P6 Planning

IFS

Timesheets

Agency

Parent Company