Report requirements.

Anjney (Baroda)

Inspection report

5 pieces

Material test (spectro test) IEPL

ABB BARODA

Development stage

Inspection report 5 pieces

IEPL format

Casting Report. (Layout report)

Control plan

Casting c.p

Machining c.p

Cp Cpk report 10 Nos.(customer format)

All dimensions (Including thread)

Chemical report

As per din 1706

Tensile test report (1No.)

As per din 1706

Regular production

CTQ as per AQL (level II & AQL 1.5)

AQL 1.5 & Inspection level II

with customer PO no. & Date

Chemical report

As per din 1706

Tensile test report (1 No)

1 test bar result

UST.

Proof stress

Report verified & signed by us

elongation & hardness

ABB USA

Development stage

Casting report (Layout report)

Inspection Report 5 pieces

As customer format

Chemical report

Hardness report (Iepl format)

IEPL format

Regular production

CTQ as per AQL (level II & AQL 1.5)

Chemical report

Hardness report ( Iepl format)

IEPL format

BDS

Development stage

customer

Inspection report

5 pieces

Hardness report

Material test (spectro test)

Tensile test

Gauge drawing (if applicable)

Gauge report (if applicable)

Internal

Regular production

customer

Inspection report

5 pieces

Internal

Bonfiglioli

Development stage

customer

Layout report (once in year)

Inspection report (5 pieces)

CMM report (with xyz coordinate)

Material test report

Leakage testing

Leakage fixture photo

Regular production

TS Automotive customers

PPAP file

Received from Other dept.

casting (foundry)

control plan

Critical Charestric foundry

Machined

In house

control plan

Cp cpk report

Critical Charestric Machine shop

supplier (vendor)

control plan

Cpk report

Critical Charestric Machine shop

Measurement system analysis plan

Measurements system analysis (MSA)

Measurements system analysis status

Layout report (once in year)

Yash high voltage

Chemical report (Iepl)

STORK

Not required

Monfors

Internal

100 % checksheet of Defect...

Mayr

Customer

Break test..(Depends on Qty)

Internal

Inspection report 2 sample

Hanning

Not required.