Report requirements.
Anjney (Baroda)
Inspection report
5 pieces
Material test (spectro test) IEPL
ABB BARODA
Development stage
Inspection report 5 pieces
IEPL format
Casting Report. (Layout report)
Control plan
Casting c.p
Machining c.p
Cp Cpk report 10 Nos.(customer format)
All dimensions (Including thread)
Chemical report
As per din 1706
Tensile test report (1No.)
As per din 1706
Regular production
CTQ as per AQL (level II & AQL 1.5)
AQL 1.5 & Inspection level II
with customer PO no. & Date
Chemical report
As per din 1706
Tensile test report (1 No)
1 test bar result
UST.
Proof stress
Report verified & signed by us
elongation & hardness
ABB USA
Development stage
Casting report (Layout report)
Inspection Report 5 pieces
As customer format
Chemical report
Hardness report (Iepl format)
IEPL format
Regular production
CTQ as per AQL (level II & AQL 1.5)
Chemical report
Hardness report ( Iepl format)
IEPL format
BDS
Development stage
customer
Inspection report
5 pieces
Hardness report
Material test (spectro test)
Tensile test
Gauge drawing (if applicable)
Gauge report (if applicable)
Internal
Regular production
customer
Inspection report
5 pieces
Internal
Bonfiglioli
Development stage
customer
Layout report (once in year)
Inspection report (5 pieces)
CMM report (with xyz coordinate)
Material test report
Leakage testing
Leakage fixture photo
Regular production
TS Automotive customers
PPAP file
Received from Other dept.
casting (foundry)
control plan
Critical Charestric foundry
Machined
In house
control plan
Cp cpk report
Critical Charestric Machine shop
supplier (vendor)
control plan
Cpk report
Critical Charestric Machine shop
Measurement system analysis plan
Measurements system analysis (MSA)
Measurements system analysis status
Layout report (once in year)
Yash high voltage
Chemical report (Iepl)
STORK
Not required
Monfors
Internal
100 % checksheet of Defect...
Mayr
Customer
Break test..(Depends on Qty)
Internal
Inspection report 2 sample
Hanning
Not required.