building a house - exterior
The process of constructing a house involves several critical stages, each requiring meticulous attention to detail. Initially, the foundation is prepared, incorporating rebar for extra support and concrete placement, followed by leveling forms with precision tools.
Megnyitás
building a house - exterior exterior finishing Patios and driveways and other utilities are installed Many details are installed such as shingles, soffits, siding, etc Decorative stone work, wood work, etc is installed roofing and windows Windows are centered/leveled before being installed Roofing tiles and corner tiles are sealed and installed Fascia boards and gutter are installed Plywood sheathing and asphalt paper are installed Trusses are approved and installed exterior walls "Bucks" are installed for basement windows Rebar is bent/cut and connected to forms Wall Forms were coated with release agent Wall Forms are installed starting with corners Plate is nailed into footing drainage Sewer waste pipes are installed Wicking process begins adding more gravel Drainage pipe is installed around perimeter Gravel poured around Foundation framing Second floor wall framing are installed in a similar manner but
uses exterior sheathing as well Subfloor (floor joists / I beams and top sheathing) is build and
attached using joists hangers Beams are installed into beam pockets and locked in by
wooden wedges Framer creates walls on the ground before being attached to
foundation by anchor bolts Once materials arrive, moisture barriers are installed before
framework (where wood touches concrete) interior walls Tar and damp proofing is installed for moisture protection Holedowns are used to bolt down walls to foundation Concrete fills the inner wall forms, left to set Steel bars are installed for strong/straight walls After Inspection, metal ties are installed into the forms foundation iron dowels and placed in footings concrete and key way put in place level forms with laserbeam rebar for extra support soil testing and replacement forms installed footings tested