Categorieën: Alle - concrete - construction - soil - engineering

door Mahmoud Abdallah 7 jaren geleden

326

GPH

The Giza Palace Hotel and Spa project involves a comprehensive construction and engineering process. Key phases include site preparation, procurement, and engineering design approval.

GPH

Giza Palace Hotel and Spa (GPHS)

construction

Phase 3
Phase 2
Building 13
Building 12 till 3rd ground floor

Ground Floor

Steel Link

Erection and Installing

Remaining of Building 8
Remaining of Building 7

5th floor

4th floor

3rd floor

Super Structure Works

Domes

Roof Floor

5th Floor

4th Floor

Soil Replacement Under SOG

Building 5

Arch. Works

Cement Plaster

External Cement Plaster

Internal Cement Plaster

Unit Masonry Assemblies

Basement 3

Struct. Works

Sub Structure Water Proofing

Masonry Under SOG

Concrete

Sub Structure Works

Basement 1

Basement 2

SOG 200 mm

Foundation

Soil Replacement below SOG

Phase 1

Procurement

Engineering Design & Approval

Site Preparation