GPH total

The Giza Palace Hotel and Spa project involves multiple phases of construction, including thorough site preparation and procurement processes. The third phase focuses on Building 2, which includes extensive architectural works such as unit masonry assemblies and cement plastering across various floors, from the basement levels to the mezzanine and upper floors.

GPH total

Giza Palace Hotel and Spa (GPHS)

construction

Phase 3
Building 2

Arch. Works

Cement Plaster

External Cement Plaster

Internal Cement Plaster

Unit Masonry Assemblies

Basement 3

Struct. Works

Sub Structure Water Proofing

Masonry Under SOG

Concrete

Super Structure Works

Domes

4th Floor

3rd Floor

2nd Floor

1st Floor

Mezzanine Floor

Ground Floor

Sub Structure Works

Basement 1

Basement 2

SOG 200 mm

Foundation

Soil Replacement below SOG

Phase 2
Phase 1

Procurement

Engineering Design & Approval

Site Preparation