Scrum Trees

In Scrum, a development team is self-organized and aligned with the project's goals, allowing them to exercise decision-making power and manage themselves without needing orders. They exclusively create the incremental product and estimate tasks in the Product Backlog, adhering to the definition of '

Scrum Trees

Scrum

Scrum Framework

Risks
Manage

disciplined implementation

rules of Scrum

flexible enough to apply to most organizations

the organization must be committed

probability & impact value

multiply 2 factors

impact of occurrence

probability of occurrence

standardized steps

identify, evaluate, respond

Threats
Opportunities
Change
Expecting change allows to better manage risk
Manage with

Update requirements to reflect change

regular interactions with the Customer (stakeholders)

portfolio/program management respond to Change Requests generated by Scrum Projects

short Sprints

Impossible to define all requirements upfront
Requirements Churn

stakeholders' needs always change during project

Quality
Reveal defects

principles

transparency-->inspection-->adaptation

make errors visible

full lifecycle every Sprint

acceptance tests every iteration

Acceptance Test Driven Development

Team has perspective & ownership of entire product to the Customer

how long to release

test & know all stages

same Team does all testing

we are delivering a product, not a task

value based thinking

update Product Backlog with new requirements

communication with stakeholders

stakeholders make better decisions

reduce gap between customer expectations & project deliverables

reflect changes in the external business environment

Business Agility

rapid response

transparency, inspection, adaptation cycles

meeting the Acceptance Criteria aka the definition of "Done"
Values
Courage

change direction as needed

act in the moment

Respect
Openness
Focus
Commitment
Properties
Complementary Practice

not part of Scrum Framework

Product Owner's responsibility for Profit & Loss

associated empowerment

parts

Rules

Events

Roles

Scrum Teams

product perspective

everything is a product

projects vs products

Scrum is a container for other techniques, methodologies & practices
Cynefin

Chaotic Domain?

projects any size
difference from traditional PM
No centralized Project Management

Transparency imperative

Principles instead of defined steps
Do not fix scope when adapting - create a new (iteration of a) product
Estimates are done for the completion of features, not internal tasks
history
Predates Agile Manifesto 1996 vs 2001
not a sequential relay race, but a team that passes a ball back and forth trying to get to the end of the field
"a holistic or 'rugby' approach where a team tries to go the distance as a unit, passing the ball back & forth"
"All-inclusive product development strategy where the development team works as a unit to reach a common goal"

Benefits/Attributes

Innovative Environment
High Velocity
Collaborative Framework makes most use of highly skilled cross-functional teams
Collective Ownership
High Trust Environment
Customer Centric
Collaborative approach to stakeholders
Business Value
Effective Deliverables
Regular reviews after creating deliverables
Faster Problem Resolution
Collaboration and colocation of cross-functional teams
Motivation
Sprint Retrospect
Efficient Development Process
timeboxing
Early Delivery of High Value
Prioritized Product Backlog
Sustainable Pace
good scheduling allows to avoid surprises
Continuous Delivery of Value
Ship Deliverables
Continuous Improvement
Continuous Feedback
Demonstrate & Validate Sprint processes
Daily Standup
Adaptability
Monitoring & Managing Progress

available to all stakeholders

Cone of Uncertainty

more of a selling prop than a useful graph

projections

do not replace empiricism

cumulative flow

Burn-up

Burn-down

updates projections

manages its progress

track likelihood of achieving SG

every Standup

compare unfinished work at the end of Sprint with last Sprint

aspect of transparency & inspection

Artifact Transparency

lack of transparency

decreased collaboration

decreased communication

diminished value

increased risk

flawed decisions

ensures informed decisions

decisions made by Scrum Team

distributed project management

decision making power delegated to all members

based on perceived state of artifacts

control risk

optimize value

Artifacts are Work or Value that provide transparency/inspection/adaptation

requirements for empirical process control

Increment
created by Dev Team only

everyone who does work on the Sprint Backlog Items

must be in usable condition regardless of whether PO releases it
sum of all the "Done" PBIs for this AND all previous Sprints
Sprint Backlog
emerges/crystallizes during Sprint

Only Dev Team can change Sprint Backlog

highly visible, real-time picture of Dev Team's work

Dev Team adds work to SB as required to achieve SG

Adjusted by Dev Team as their understanding of what's needed to achieve Sprint Goal grows

track at least every Daily Scrum

remaining work can always be summed

estimates of remaining work are continuously updated

detailed enough for changes to be understood in Daily Scrum

contains

plan to realize Sprint Goal

plan to deliver the product increment

PBIs selected for Sprint during Sprint Planning

SBIs for the first days of a new Sprint are decomposed to units of one day or less

is a forecast by Dev Team

work needed to deliver functionality as "Done"

solely owned by Dev Team

functionality in next increment

system terms vs business terms
aka Release Backlog?
can be used by multiple Scrum Teams
items

higher items more clear & detailed

allows for more precise estimates

attributes/states

"Ready"

agreed depth/level of description

between Dev Team & PO

other

e.g. group items by the Scrum Team

value

estimate

order

description

types

fixes

enhancements

requirements

funcitons

Refinement

make Product Backlog

may delegate these tasks to Dev Team, but remain accountable/responsible

show what the Scrum Team will work on next

understood

transparent

visible

Optimize the value of the work performed by the Development Team

Order the PBIs to best achieve goals & missions

e.g. ROI or value

Express Product Backlog Items clearly

Stakeholders & Scrum Team must easily understand

Prepare for upcoming Sprint

Items must be deemed "Ready"

each item intended for next Sprint must be refined to the degree that it can be reasonably "Done" next Sprint

Story Sizing

Relative Business Value

historic truths vs prophetic suppositions

Other Projects

possibility to equate business value points to revenue using historic metrics

some limited scenarios only

ratio of average man-hours to story points by the same team for one Sprint

predict how much is left

estimate actual costs

story points aren't comparable between different projects

divergence

reveal symptom of another problem

do the cosmetic tasks possess higher value?

no

communication/organizational problem?

should not be scheduled first

yes

should have been factored in earlier

discrepancies may expose bias

e.g. cosmetic tasks may score low points, but higher priority

advantage

quantify ROI

highlight discrepancies & expose bias

e.g. death march

maximize value

Scrum Team receive feedback

customer

helps Product Owner to maximize value

continuously looks for value

analyses work weekly

track points weekly

even mid-Sprint?

points drop

value delivered first

estimate velocity

flat or increased as team gels

point estimates done by customer

assign business value points to each story

value points

Indications of value on Product Backlog are useful but are only a prediction until validated against users and market.

It is a good practice, keeping in mind that market reception is the best measure of value.

Dev Team & PO

PO can help to select trade-offs

people who do the work do the estimates

Dev Team responsible for all estimates

review & revise items

acquire a degree of transparency

Scrum Team decides when and how

ongoing process

dynamic

never complete

evolves with the product & environment

Responsibility & discretion of PO

business terms

Dev Team will translate into system terms during Sprint Planning & Refinement

can make changes any time

ordering

availability

content

Scrum Team

Non-core Roles
Chief Scrum Master
Chief Product Owner

Only in the Indian Scrum, in regular Scrum there is only one Product Owner

Multiple Scrum Teams

Vendors
Stakeholders

the project produces "the collaborative benefits" for the stakeholders

customers, users, sponsors

discussion

engaging stakeholders

persuasion

adopt a new perspective

requires effort

form of a sale

Maintaining business justification

outward

a favourable business perspective

image

inward

features

Reception of a product is often a matter of marketing.

manage the Product Backlog
entire organization must respect the order of PBIs set by Product Owner
Product Release Decision Maker
Product Marketplace Expert
Chief Product Visionary

can a consultant do that?

One person

not from the client

must be from the performing organization

doesn't need to understand the technology, just the business

may represent a committee

Track total remaining work

compare with amount of work remaining after previous Sprint

velocity

transparent to all stakeholders

at least every Sprint Review

Articulate customer requirements

Receive requirements from the Customer

Voice of the Customer

Maintain business justification for the project

Flexibility

stakeholder confidence

Deliver value/results early

Achieve maximum business value for the Project
Development Team
Referred to in the unofficial (Indian) guide as "Scrum Team"

possibly because traditionally management is something done to teams, so the management positions are assumed to be outside the team

Product Owner is the only person who can tell the Dev Team what items to deliver

by placing them in the PB

work

full-time employment recommended

increments

always work in product-based way

systems, projects, etc. are all viewed as Product

manage itself

tracking Sprint Backlog at least every Daily Scrum

refine Product Backlog

on behalf of PO

consume < 10% of capacity of Dev Team

manage Sprint Backlog

work in SB can be summed up at any time

deliver PBIs

exclusively create

estimates in the Product Backlog

the Increment

definition of "Done"

no specific titles

Specific titles are good for production environment. In development there are too many unknowns to overlook increases in responsiveness and agility afforded by increased communication and idea exchange that results from all team members sharing the same goal and responsibility.
Role based configuration works in the military and in production. Wherever the labour is heuristic, as opposed to algorithmic, and creativity is a job requirement, value based mindset produces the most efficient teams. Value based thinking unites the team members in striving to add value to the product/business, to achieve a common goal.

no sub-teams

all members have the same role

different roles

prevent value based approaches

segment focus

promote different goals

value-based vs role-based thinking

equally responsible/determined to deliver product

e.g. designer/quality inspector/team leader

self-organized

aligned with the goal of the project

can exercise decision making power in managing themselves because aligned w/SG

find their way instead of receiving orders

manage themselves

joint accountability

jointly accountable & responsible for the delivery of every task

people don't own assigned tasks

tasks are owned by the whole team

cross-functional

do not change members during Sprint

application area experts

3-9 people

preferable for same person not also be on Dev Team

can be on Dev Team

when executing items from the Sprint Backlog

servant-leader for Scrum Team & organization

help those outside the Scrum Team

understand which interactions are helpful

change interactions to maximize value created by the Scrum Team

help/work with Scrum team & the organization

involves

change management

convincing

learning

understand and practice agility

increase transparency of artifacts

help Scrum Team

facilitate Scrum events as requested/needed

understand the need for clear & concise PBIs

help Dev Team

coach Dev Team till Scrum fully adopted/understood

remove impediments

create high value products

add to value by applying Scrum

self-organization & cross-functionality

help Product Owner

Facilitating related events

Communicating information

Understand & practice agility

Arrange PBIs to maximize value

Product planning in an empirical environment

Find techniques for effective Product Backlog management

to detect incomplete transparency

detect discrepancy in expected & factual results

listen closely to communications

sense patterns

inspect artifacts

apply practices to cope w/incomplete transparency

continuously work to increase transparency of the Artifacts

ensure complete transparency

Scrum Team & others

usually leads the adoption of Scrum in organization
facilitator

still is a management position

manages the Scrum process, not the Scrum Team

more of a role than a position

clear impediments

doesn't need to understand the architecture

Characteristics
3-9 members

only count people who execute PBIs

Scaled Scrum for larger groups

Regardless of how many sub-Scrums there are, there is only one Product Owner

6-10 members

unofficial Scrum (Indian)

frequency depends on

level of complexity

size of project

inter-team dependency

holonic?

team model optimizes

productivity

creativity

flexibility

Cross-functional

no need for outside assistance

Self-organized

Scrum Cycle

Exceptions
Requirements instead of User Stories

Other properties still present

e.g. Standup, "Done", etc.

There may be not enough Agile culture to start with User Stories?

Scrum Team forming

not enough value based thinking yet?

Caveats
Scope may be renegotiated w/PO as more is learned in the course of Sprint
Quality goals do not decrease (?)
cancel (end) before timebox

incomplete Stories

re-estimate frequently

Incomplete work depreciates quickly

Re-estimate incomplete SBIs, put them back in the PB

Still do Sprint Review on the completed PBIs

when SG becomes obsolete

Only by Product Owner

No changes can be made that may endanger Sprint Goal

otherwise redo Sprint Planning, and create a new Sprint Goal

No gap between Sprints

New Sprint starts immediately when previous Sprint ends

< 1month project

Sprints are like projects with

flexible plan of work & product

design

definition of what will be built

Sprints are like calendar months - we can't/don't want to add days to a month

use to measure KPIs e.g. velocity

more work than 1 month?

change definition of what will be built

Definition of "Done"

standard for each product

dictates how work should be done on this particular system/product

use company's conventions as starting point

define for every product

ensures artifact transparency

shared understanding

adapted at Sprint Retrospect

managed by the Dev Team

Dev Team defines "Done" for Scrum Team

guides Dev Team during Sprint Planning

how many PBIs to select for Sprint

allows to quantify work

not Acceptance Criteria

Acceptance Criteria can form basis of new stories

Acceptance Criteria apply to specific items

"Done" applies globally

used to assess when work on increment is complete

same requirements for individual PBIs?

Acceptance Criteria

Create a usable and potentially releasable "Done" product increment
Variations
Processes (waterfally)

Release

Retrospect Project

Review & Retrospect

Retrospect Sprint

Demonstrate and Validate Sprint

Convene Scrum of Scrums

Implement

Groom Prioritized Product Backlog

Conduct Daily Standup

Create Deliverables

Plan & Estimate

Estimate Tasks

Create Tasks

Approve, Estimate and Commit User Stories

Create User Stories

Initiate

Conduct Release Planning

Create Prioritized Product Backlog

Develop Epics

Form Development Team

Identify Scrum Master and Stakeholders

Create Project Vision

Business Justification

Processes can accommodate change in business justification

Value-driven Delivery

Help key decision makers understand the business need for a change or a product

Standard Scrum

Can be any other coherence as long as it causes Dev Team to work together, rather than on separate initiatives

Selected PBIs deliver a coherent function

Gives the Dev Team flexibility in functionality to implement

Guides the Dev Team as to why it's building the increment

crafted by entire Scrum Team

after the Dev Team chose the PBIs at the Sprint Planning meeting

Objective to accomplish by building PBIs in the Sprint timebox

Sprint lifecycle changes

Sprint Backlog may be re-negotiated

cancelled only when Sprint Goal becomes obsolete

Sprint is designed to implement new functionality

therefore Sprints where the customer is not involved are prohibited

redundant w/Continuous Deployment

refactoring

code review

no ad hoc meetings

interrupted work

unprepared participants

are

fixed objectives

predefined meetings

designed to promote

adaptation

regularity

inspection

critical transparency

is a container for

maintenance of product Backlog

development effort

the 4 events

Sprint Retrospective

inspect Sprint process in regard to

tools

process

relationships

people

adapt definition of "Done"

to increase product quality

identify potential improvements

identify & order major items that went well

accountable for Scrum process

participates as peer

encourages to improve the dev process

within the Scrum process framework

teaches to timebox

ensures the event takes place

ensures purpose is understood

formal opportunity for improvement

review (inspect/adapt) the Sprint process

focus on inspection & adaption

boyscout rule

internal meeting

entire Scrum Team

3 hrs timebox

Dev Team demonstrates outcome of Sprint

Scrum Team and stakeholders

collaborate to optimize value

result

Product Backlog may also be adjusted to meet new opportunities

revised Product Backlog w/probable PBIs for next Sprint

Assesses overall project progress

can do it more often than every SR

Accepts PBIs

purpose

adapt Product Backlog

inspect increment

Development Work

Dev Team implements functionality & technology to satisfy the Sprint Goal

if that results in unexpected work

collaborate w/PO to negotiate the scope of Sprint Backlog within the Sprint

Daily Scrum

function

key Inspect & Adapt meeting

improve Dev Team's knowledge

highlight and promote quick decision-making

identify impediments/risks

eliminate other meetings

improve communications

optimizes probability that the Dev Team meet the SG

Scrum Master

enforces rule that only Dev Team members participate

pigs & chickens

ensures that Dev Team has the meeting

teaches Dev Team to timebox Daily Scrum to 15 min

DevTeam

Inspect the work since last Daily Scrum

inspect how progress is trending

inspect progress

Synchronize activities

meet after to have more detailed discussions

Parking Lot

must understand how it intends to work together today as a self-organizing team to meet SG

Conducts the Daily Scrum

Forecast work to be done before the next Daily Scrum

Make plan for the next 24 hours

3 questions

what impediments prevent me from helping the Dev Team meet Sprint Goal?

what will I do today to help the Dev Team meet Sprint Goal?

what did I do yesterday that helped the Dev Team meet Sprint Goal?

15 minutes

regardless of size

Sprint Planning

inputs

Past performance of the Dev Team

perhaps should be of the Scrum Team

Projected Capacity of the Dev Team

Velocity

Latest Product Increment

results from previous Sprint Review & Retrospective

participation

First days decomposed into units of 1 day or less

Should be able to explain to PO & SM how it will self-organize to accomplish SG

Self-organizes to undertake the work

collective responsibility & ownership of work

e.g. individuals volunteer to do work

Receives sufficient data from the Scrum Team during Sprint Planning to forecast amount of work it can get "Done"

Design System and Work to convert PB into a working product

Create Sprint Backlog

PBIs + plan how to "do" them

Invite other people to provide advice

Renegotiate the PBIs with Product Owner

Choose # of PBIs

estimate their own productivity

select individual PBIs as well

e.g. if too much work

How to turn selected PBIs into a "Done" increment by the end of Sprint?

Product Owner

PBIs that will achieve Sprint Goal

make trade-offs

clarify requirements

discuss Sprint Goal (business objective)

Entire Scrum Team

designs the work into Sprint Backlog

inspects work from the PBIs

crafts Sprint Goal

Dev Team

select PBIs

Assess what it can accomplish

Forecast functionality that will be developed in the Sprint

the hypothesis

Scrum Master makes sure

attendants understand purpose

event

timeboxed

teach Scrum Team to timebox

happens

answer

Why is the Dev Team building the increment?

Sprint Goal

How will the work needed to deliver the increment be achieved?

What increment of work can be delivered in the timebox of the Sprint?

< 8hrs for 1 month Sprints

Agile

Sprint

Retrospect Sprint Meeting

discuss how to improve process & performance

Sprint Review Meeting

Product Owner accepts the Deliverables based on Acceptance Criteria (Done)

Demo the Deliverables to Product Owner & relevant stakeholders

Daily Standup Meetings

highly focused

short

Sprint Planning Meeting (Iteration Meeting)

High priority User Stories considered for inclusion in Sprint Backlog

Create potentially shippable Deliverables or product increments

1 - 6 weeks

Product Owner creates Prioritized Product Backlog

in the form of User Stories

prioritized list of business and project requirements

Stakeholder Meeting

Create Project Vision Statement

Study Project Business Case

Principles

Iterative Development
Product Owner's responsibilities
Change Management
Value-based Prioritization
Maximum business value early
Collaboration
Core Dimensions

Appropriation

Adapt technology to serve custom ends

Articulation

Partition work into units, divide between members, & reintegrate it into a finished product

Awareness

aware of each other's work

Requires healthy communication

Bus number

Standup meetings are a collaboration tool

e.g. a team might shift resources to help a member

fewer change requests

fast risk identification

continuous improvement

e.g. Scrum Master improves on the team based on the Sprint Retrospect

colocation

formal & informal communication

trust

high bandwidth communication

problems fixed on the spot

questions answered quickly

cooperation vs collaboration

collaboration is everyone contributes to each feature of the final product

cooperation is sum of everyone's work

Time-boxing
Prescribed events

create regularity

minimize need for other meetings

skipping events reduces transparency

designed to enable critical transparency and inspection

Cadence

All events timeboxed

events

Sprints

Standups

Sprint Meetings

Sprint Review Meetings

events end when purpose of event achieved

reduce "waste in the process"?

a nod to Lean?

Sprint duration is fixed & cannot change once Sprint started

PERT compatible

Burn-down, etc.

Critical path always visible

benefits

Contain risks and complexity

Limits cost

Predictability

quantifies processes

e.g. Velocity

customer knows when feedback will be required

timeboxing ensures inspection & adaptation of process

Self-Organization
no centralized Project Management

Project Management responsibilities are distributed among the 3 roles

Innovative environment conducive to growth
not directed from outside the Team

management and specialist efforts are not separated

team needs pm skills, but not a pm

team buy-in

there is no such subset of the project team that is responsible for project management while others are only responsible for specialist activities

Scrum Team chooses how to best accomplish their work

shared ownership

Approve, Estimate & Commit User Stories

Scrum Team has all competencies to produce a releasable, Done product

value based thinking, not role based thinking

own entire product as negotiated with the Customer

no separate test team

autonomous organization of work

towards given goals

within boundaries

Team buy-in
Empirical Process Control
Evidence Based Management

systematic use of evidence outperforms expert-only judgement

all knowledge intensive domains & complex activities

education

criminal justice

social care

medical practice

suboptimal care

preferring personal beliefs & conventional wisdom to research

reliance on experts' assumptions

not using existing research and data

Lack of systematic sharing

feedback less valued

transparency

manage risk to patient health

Evidence Based Medicine

just enough process to generate the transparency, inspection and adaptation cycle

Empirical Process Control Theory or empiricism

Get the cook in the kitchen

Each event is formal opportunity to inspect & adapt

Adaptation

iterative delivery

(potentially) shippable product each iteration

no need to adjust scope because this iteration of the product is complete

next version of a complete product

adapt product definition

adjust process or material being processed

adjustment must be made ASAP to avoid further deviation

if inspector determines aspects deviating outside acceptable limits & resulting product is unacceptable

empirical process control

development is too complex to rely on canned procedures

production vs development

monitor the relative efficacy of management & development practices

Inspection

material for analysis during Adaptation

best when done by inspectors at the point of work

Scrum users frequently inspect

doesn't get in the way of work

progress toward Sprint Goal

detect undesireable variances

artifacts

inspection of the Deliverables by the Product Owner

continuous customer feedback

Transparency

necessary to do Inspection

Information Radiators

Sprint Burndown Chart

shared Scrumboard

Meetings

Sprint Review

Daily Standups

Artifacts

Release Planning Schedule

Project Vision

Product Backlog

common standard for the aspects of the process that must be visible to those responsible for the outcome

e.g.

definition of "Done" shared by those who work & those who accept work

common language referring to the process shared by all participants

observers must have a common understanding of what is being seen

collaboration & communication between the Scrum Team members