Mining Service Project
The project involves multiple critical phases to ensure the successful completion of a mining service operation. Initially, the planning phase encompasses the proposal of engineering drawings, budgeting, site visits, and resource management.
Megnyitás
Mining Service Project Delivery Phase Receiving approval
from clients. Feedback from
employees Closing the finance
account Handover of
technical documents Handover of setup
to client Overall Testing
and Licensing Phase Licensing of setup by
third party contractor
or Industry expert Testing of pumps
and water lines Execution Phase Concreting of sump Design of sumps using
Mini excavator/Muki Setup of pumps Installation of plumbing lines,
valves and NRV Installation of wiring ducts
and completion of wiring Transportation of equipments
to the planned location on site Lowering the equipments
into mine Unloading the equipments
and components on site Mine Preparation Phase Measuring and mapping of
area for equipment placement Installation of safety
equipment Construction of base for
pumping setup Safety checks of pathways
and preparation of equipment
base site Prepare pathways for daily
mining operations Clearing mine for easy access
and work space for labourers Clearing mine of any obstacles
that hinder unloading and
installation of components Approval Phase Approval of HSE and Licenses Approval of Budget,risk assesment,
resource management and project
timeline Approval of Aquisition Approval of Engineering
Drawings and Design
(internally and with
licensed third part) Planning Phase Aquisition and transportation of
materials and equipment Budgeting Resource Management Risk and safety assesment Estimation of Project Duration
and time Proposal of Engineering Drawing Site Visit and Visual Inspection