Mining Service Project

The project involves multiple critical phases to ensure the successful completion of a mining service operation. Initially, the planning phase encompasses the proposal of engineering drawings, budgeting, site visits, and resource management.

Mining Service Project

Mining Service Project

Delivery Phase

Receiving approval from clients.
Feedback from employees
Closing the finance account
Handover of technical documents
Handover of setup to client

Overall Testing and Licensing Phase

Licensing of setup by third party contractor or Industry expert
Testing of pumps and water lines

Execution Phase

Concreting of sump
Design of sumps using Mini excavator/Muki
Setup of pumps
Installation of plumbing lines, valves and NRV
Installation of wiring ducts and completion of wiring
Transportation of equipments to the planned location on site
Lowering the equipments into mine
Unloading the equipments and components on site

Mine Preparation Phase

Measuring and mapping of area for equipment placement
Installation of safety equipment
Construction of base for pumping setup
Safety checks of pathways and preparation of equipment base site
Prepare pathways for daily mining operations
Clearing mine for easy access and work space for labourers
Clearing mine of any obstacles that hinder unloading and installation of components

Approval Phase

Approval of HSE and Licenses
Approval of Budget,risk assesment, resource management and project timeline
Approval of Aquisition
Approval of Engineering Drawings and Design (internally and with licensed third part)

Planning Phase

Aquisition and transportation of materials and equipment
Budgeting
Resource Management
Risk and safety assesment
Estimation of Project Duration and time
Proposal of Engineering Drawing
Site Visit and Visual Inspection