Scope Management

The process of defining the scope in project management involves several critical tools and techniques, including expert judgment, product analysis, and workshops. This phase is essential for developing a clear and agreed-upon scope statement, which outlines the project'

Scope Management

Scope Management

4.0 Verify Scope

as before for CHANGES also accepted deliverables will necessitate updates to the plan, risk register etc as well as status or update reports

Those deliverables not accepted and the reasons why. May result in change to requirements or change to production process.

Accepted deliverables

Formal acceptance/'sign-off' from the customer/sponsor

Inspection

Measuring Examining Verification against requirements and acceptance criteria

Validated deliverables

Those deliverables having passed through the Project Quality Control process and are now ready for 'sign-off'.

Now we see how, as mentioned at 1.0, this document helps to ensure that what was requested is what is delivered.

Seen before as an output of 3.0

Formalised acceptance of the deliverables. Review with customer/sponsor to ensure satisfaction

5.0 Control Scope

as before for CHANGES e.g. Requirements Documentation

PMP updates

Updates to specific components of the PMP depending on nature of Scope Control activities carried out e.g. change to Scope Baseline

Change Requests

Self explanatory. Requests go through the Integrated Change Request process seen before at PM401

Organisational Process Assets Updates

'lessons learned' other important information for future project or operational work

Performance Measurements
Variance Analysis

Performance Measurements used to determine variance form Scope Baseline. Determine cause and severity and whether corrective action is required.

Seen before but in this context existing control procedures, montioring and reporting methods. May be part of a PMO depending on the maturity of the organisation. PMO seen before in PM401

Work Performance Information

Current project progress, what's underway, what's completed, how the project is tracking, what performance is being achieved (performance indicators)

Project Management Plan (PMP Seen before in PM401

Specific components of the PMP such as: Scope Baseline Scope Management Plan Change Management Plan Configuration Management Plan Requirements Management Plan

The process of monitoring status of the project and product and managing changes to the SCOPE BASELINE

3.0 Create WBS

Updates to 'other' Project documents

for e.g. creating the WBS may generate the need for CHANGES. If approved they may necessitate updating of project documents - requirements documentation, scope statement, etc.

Scope Baseline

Self explanatory

Scope statement WBS WBS Dictionary

WBS dictionary

Describes the components of the WBS in more detail

WBS

The deliverable oriented decomposed work to be done Progressively more detail per level

Students are to produce a WBS as an LO

Decomposition

Using organisation guidelines (company PMO) The analogy approach The top-down approach The bottom-up approach - smallest bit and roll them up Mind-mapping approach

This is a BIG topic might need group discussion to decide what to include. Summaries, key points, detail v overview etc

Seen before

Produced as an outcome of 2.0 Reinforce project flow

WBS is a deliverable-oriented grouping of the work involved in a project. It defines the total scope of the project and provides the basis for planning and managing project schedules, costs, and changes.

Work Packages

2.0 Define Scope

Scope Statement

A scope statement is used to develop and confirm a common understanding of the project scope. It should include a project justification a brief description of the project’s products a summary of all project deliverables a statement of what determines project success the exclusions, constraints and assumptions

Students are to produce a SCOPE STATEMENT as an LO

Tools and Techniques
Expert Judgement Product Analysis Identifying Alternatives Workshops

Develop the idea of assumptions, constraints, risks, analysis as part of this process

Organisational Process Assets

Other project assets - e.g. templates etc

'Lessons learned' from previous projects

Company policy and procedure

Seen before 1.0 as an output now becomes an input of 2.0

Now we can introduce the concept of FLOW in project planning. How the output of one process feeds into another.

Seen before in 1.0

Essentially what is IN scope and what is OUT of scope

We can first talk about understanding and analysis of RISKS, CONSTRAINTS here

Once we have the authority to proceed via the charter then....During the PLANNING stage (project management process 5 phases) we understand more about the project and define the detail

1.0 Collect Requirements

Outputs
Requirements Traceability Matrix

Develop the idea of CHANGE CONTROL and how

Links requirements to origins and traces activity throughout project. Helps to ensure that what was requested is what is delivered.

Requirements Management Plan

We can first mention CHANGE CONTROL here

Follows on from the initial documentation and sets out how requirements are managed and throughout the project

Requirements Documentation

Matches requirement to business objective lots of information on this. Need to edit ourselves to ensure effectiveness

Tools and Techniques
Interviews Focus Groups Workshops Questionnaires Prototyping Observation

Method selection may depend on project complexity time/cost constraints company culture (congruence) results criteria

detail them all and get the students to select the 'best' method relevant to the scenario

Inputs
Stakeholder Register

We've seen this in PM401 and know what it is. From here we determine who will have the expertise/experience/authority to help with requirements gathering. This will have been developed in assessment 1 activity PM401

Project Charter

Made need to refer to an exemplar or template, look at simple charter created in assessment 1 activity 3 PM401

Definition
The requirements of the project - what is it producing

Main topic

Also need to talk about the need to ensure good Scope Management procedures to guard against SCOPE CREEP
Here we need to establish the plurality of Project Management. Talk about the SCOPE of the PRODUCT and the SCOPE of the PROJECT.
Define and discuss SCOPE in the context of Planning. What has already happened at the Planning stage? What has been produced before we get into the detailed stuff!