av jaydip joshi 9 år siden
258
Mer som dette
Measurements system analysis status
Measurements system analysis (MSA)
Machined
supplier (vendor)
Cpk report
In house
Critical Charestric Machine shop
Cp cpk report
casting (foundry)
Critical Charestric foundry
control plan
Leakage testing
Leakage fixture photo
Material test report
CMM report (with xyz coordinate)
Inspection report (5 pieces)
Layout report (once in year)
Gauge report (if applicable)
Gauge drawing (if applicable)
Tensile test
Material test (spectro test)
Hardness report
As customer format
1 test bar result
elongation & hardness
Proof stress
Report verified & signed by us
UST.
with customer PO no. & Date
AQL 1.5 & Inspection level II
As per din 1706
All dimensions (Including thread)
Machining c.p
Casting c.p
IEPL format