Design Specification
Type in the name of the project that is under review, and press Enter.
6.Environment
Follow-up
When
When will the change be implemented?
Add a target date for completion.
Who
Person
Who will implement the change?
Identify the person(s) responsible for implementing this change.
6.1 It should be recyclable or atleast have a smaller environmental footprint because the apple watch is mass produced and has a big footprint.
Review the analysis of performance, what went well and what could have gone better and summarise the changes that you will make as a result of this review.
Think about changes to:
- Project planning, resourcing, and management
- Risk assessment and control
- Information available to team members
- Requirements management
- Technical processes
- Change control
- Testing
5.Product Constraints
5.1 It mustn't be too heavy as that could cause fatigue
5.1 It must be big enough to be easy to use but also not too big as it becomes inconvenient.
4.Ergonomics/Anthopometrics
4.2 It needs to fit the 5th and 95th percentile of people
4.1 It needs to come with adjustability
for a wide percentile range
3. Materials
Objective
3.5 Product wristbands need to be flexible and to come in a wide range of design.
3.4 Needs to be considering materials that are sustainble
3.3 The glass ontop needs to be durable and hard to ensure low chances of breakage (quality control)
3.2 The materials need to be cheap enough to make profit.
3.1 High quality materials to meet Apple's design language and standards.
The objectives of the review should be explained to participants and kept in mind during the review.
Add an objective after reviewing your project.
2.Target Audience
2.4 Suitable for more mature generations, not children (for safety reasons)
2.3 Price needs be affordable for people to afford.
2.2 Suitable market for professionals and buisness people
2.1 Students, employees or sportsmen
Who should take part in the project review?
Consider:
- Customer representatives
- User representatives
- Project managers
- Team members
- Quality Assurance staff
Add a participant.
1.Manufacture
This related to the making of the product:
-Think about the scale of production in industry
-What techniques make be required
1.5 CAM for compatibility with machinery and automation.
1.4 Product needs to be able to be manfuactured all over the world.
1.3 Automated production
1. 2 Flexible manufacturing for multiple types of products
1.1 Manfuactured in Mass Amounts
Main topic
TEST
11.1
Subtopic
10.Aesthetics
10.4 square shaped screen
10.3 different colour watches
10.2 different colour watch bands
10.1 look modern to appeal to younger audiences
9.Function
Area
Add an area that could have gone better, and which could be improved in future projects.
9.5 allows to respond to calls
Change
What changes could be made to processes and methods to avoid default in future projects?
Think about:
- Project management and planning
- Risk assessments
- Project communication
- Requirements management
- Technical processes
- Change control
- Testing
9.4 allows to respond to text messages
Process
What role did processes play?
- Did processes and methods play a part in the project?
- Did they fail to identify or cope with problem situations?
- Or did problems arise by not following normal processes?
9.3 giving directions (it has a gps)
Predictor
Were there any predictors?
- Were there any warning signs that the project would not go well?
- Were there any early signs of trouble which were missed?
- Were there any early signs of trouble, but no action was taken?
- Were there any early signs of trouble, but the wrong action was taken?
9.2 playing music
Reason
Add some notes about the reasons behind the project.
Was it due to:
- Inadequate skills or knowledge?
- Insufficient planning or risk assessment?
- Lack of information or incorrect information?
- Inadequate processes or tools?
- Incorrect use of processes or tools?
- Bad luck (coincidental problems)?
- Other reasons?
9.1 telling the time
Problem
Add some notes about what went wrong with the project.
Was it:
- Late?
- Over budget?
- Not doing the right thing?
- Unreliable or faulty?
- The source of more problems later?
8. Size
8.3 Size of the dial and button so it is comfertable to use
8.2 Size of the strap for different people (children, teenagers/ adults- women, men)
8.1 Proportions of the body of the watch to the strap
7.Safety
7.2 no sharp corners
7.1 Smooth surfaces