Maintain list of Vendors?
Should we use a flow chart for
referencing and maintaining Standards?
GRAND CENTRAL
NOTES
CUSTOMER
INVENTORY
BOX TRAILERS
SOUTH TRAILER
27
24x20
24
22
20
19
18
16
15½
13½
13
11
10
9
NORTH TRAILER
39x20
36x36
30x30
30x20
28
27½
24x18
22x18
20x16
FOAM TRAILER
All Packing / Shipping Foam
"ACE"
Consumables
VERTICAL STORAGE
Acrylic
CNC
APPRO Bodies
Custom Projects
Cylinder Parts
Veneer
BOOTH
HPL
STORAGE RACKS
Melamine
PRODUCTION by DEPARTMENT
APPROS
Body Material
Tops
CUSTOMS
CYLINDERS
ACRYLICS
MAIN SAW
Paint Booth
RECEIVING
Where is the order Received?
EAST SIDE
Need ForkLift?
YES
Find Forklift Operator
UNLOAD ORDER
PUT KANBAN with Product(s)
(at proper reorder point)
Stage Product if it can't be put right away.
NO
Put KANBAN with order
(at proper reorder point)
Put product away if possible
SHIPPING AREA
USPS
FedEx
UPS
MATERIAL FLOW
No KANBAN
Engineering Request
Design / R&D
Custom Job
Place Order on Website
CALL in Order
No Kanban Exists
Create Kanban Card
Missing / Lost Kanban?
Try to find the Kanban card.
-In the past, they have usually been located with the backstock and is just not being seen / found.
Special / 1x Order
Employee Special Request
for Improvement
NEEDS a Kanban
KANBAN
Check KanBan card for ordering method
PLACE ON WEBSITE
EMAIL | CALL VENDOR
Place Kanban in "Ordered, NOT confirmed" BIN,
-Waiting for a confirmation.
Once Confirmed,
Move Kanban to "ORDERED" Bin
KATANA
Send PO w/ KATANA