arabera José Arévalo 5 years ago
354
Honelako gehiago
To promote, coordinate and articulate efforts for Social Assistance to the community.
August 2010 - Present
Course on International Banking and Exchange (BV, BANKING BUSINESS, TRADE MECHANISMS)
December/1997
Workshop Course Project Quality Information Systems (TQM, PECA, CONTINUOUS IMPROVEMENT, STATISTICAL PROCESS CONTROL, ISHIKAWA DIAGRAM 14 PTOS-DEMIN G, CROSBY, Taiichi Ohno / SOFTWARE QUALITY MODELS (McCALL, BOEHMN, ISO 9126) , ISO 159)
December/2004
Course - Workshop Projects Management Information Systems (INTEGRATION - PLANNING (Scope, Time, Cost, Quality, HR, Communications, Risk, Procurement) - PERFORMANCE - MONITORING AND CONTROL)
November/2004
Oracle 10g Enterprise Service Bus Workshop / Oracle Peru / Instructor: Jorge Taboada
November/2006
Oracle SOA Suite 10g / Oracle Peru - Instructor: Jorge Taboada
May/2007
Business Process Modeling with BPA Suite - Oracle Peru - Instructor: Abilio Tinoco
July/2007
Express Architecture - Oracle Peru - Instructor: Ismael Vega (Oracle Colombia)
August/2007
ITIL
Business Application's (Software Based)
PM (Project Management)
HRM
CRM
ERP
MW
SOA & BPM
WSO2
ORACLE
Oracle AIA
Oracle AIA Pre-built Integrations as Process Integrations Packs (PIP)
Oracle AIA Pre-built Integrations as Direct Integrations (DI)
Oracle Application Integration Architecture (AIA) Foundation Pack
Oracle BPM Suite 11g
OS
Windows
Linux
Dev Technology
Declarative (XML Based)
OWL & RDF
SCA, BPEL, ESB, BR, WS-*
Programatic
PHP
J2EE
JSR's
Business Analysis
Process Modeling
Requirements Analysis
Planning the Roadmap Project.
Project Management
PMI
Note: UNI-MICROSOFT Convention (I Grant from Competition)
End Client
"Bank Bolivarian - Guayaquil - Ecuador"
Authentication based on WS-SAML
"BIDIRECCIONAL INTEGRATION - Oracle Enterprise Service Bus (OSB) & IBM Websphere MQ Series (MQ)"
Sequence Flow 3.1 Integration
OSB in WLS
The Mediation flows that can treat the data frames before invoking the BPEL flows
SENAE
IESS
Integration with MQ queue through the MQ Adapters
Proxy Services
Request Flow in the Pipeline
It is the sequence of steps that must be performed before, during and after performing the call (invoke) to the BPEL flows.
It is the component within the OSB, in which the flows of Pipeline Pipeline Request and Response are implemented.
OSB administered Technologies:
MQ (Receive Message Entry)
Communication between MQ Server and MQ Client
Describe the communication between components of IBM WebSphere MQ through MQ protocol, through the mechanism of listener, the same as is set by the Request launched by bookstores MQ Client and the corresponding Response provided by the MQ Server, with order to detect messages that have arrived in the queue, to transport them instantly to the Request Pipeline Proxy Service in OSB, goes to the pending completion of the Response Pipeline flow.
The MQ Technologies let you manage the messages that are placed in the input queue.
Flow is beginning from the time that the MQ Technologies recorded messages left on the input queue, identified as BRANCH_REQ_MFR
External Consultant Specialist Architecture and SOA-based integration
October 2013 - November 2013 (1 month)
"Technical Secretariat National Competitiveness Council (CNC) Presidency of the Council of Ministers (PCM)"
Integration and ONGEI SUNARP late facilitate tracking and monitoring of States Constitution related to Business Process through the College of Notaries of Lima Company Formation Online 72 Hrs in PCM and MACMYPE Canal.
External Consultant Integration Specialist
March 2011 - July 2011 (5 months)
"National Office of Electronic Government and Information Technology (ONGEI) - Unit Co Executing ""Presidency of the Council of Ministers"" (PCM) - Program State Modernization and Decentralization - (Loan Agreement No. 1437/OC-PE)"
Integration of Information Systems of Public Entities Constitution linked to Process Business Line (CEL) led by the Presidency of the Council of Ministers (PCM) through the National Office of Electronic Government and Information Technology (ONGEI):
Entities Involved
ONGEI / PCM
RENIEC
BANK OF THE NATION
SUNARP
MACMYPE
COLLEGE OF NOTARIES DE LIMA
PRODUCE
External Consultant Specialist Management Process Integration
August 2010 - July 2011 (1 year)
Obrainsa
Contractor
Global Business Solutions
"Integration Consulting Oracle EBS and Oracle-Primavera"
Detail
Concluding with the correct exchange of data on:
- * Budget
- * WBS
- * Projects Manager's
- * Hourly Cost of Resource(Rol)
- * List of Resources
After which you had to validate the proper operation and deployment of Process Integration Pack (Process Integration Pack / PIP) between:
- * Oracle E-Business Suite (EBS)
- * Oracle Primavera (P6)
"We worked together with the team of Platform Install, Deploy, Deploy, Try:
- * AIA Process Integration
--- * Http://www.oracle.com/technetwork/apps-tech/aia/overview/index.html
- * AIA Foundation Pack
--- * Http://www.oracle.com/technetwork/es/indexes/products/default-152614.html
- * Oracle BPM 11g
Responsible Technology Architecture Consultant
Technologies Involved
AIA Process Integration Pack
AIA Foundation Pack
Oracle BPM
February 2012 to March 2012 (2 months)
"PNSR execution unit Deputy Minister of Construction and Sanitation Ministry of Housing and Construction"
Project
Development of a Process Model for National Rural Sanitation Programme (PNSR, PRONASAR, PROCOES, AMAZON VILLAGE), assigned to the Vice Ministry of Construction and Sanitation
Participating Organizations:
Gathering information about their processes include the following organizations:
The National Rural Sanitation Programme (PNSR)
Program Water and Sanitation for Rural Amazon (Amazon Rural).
Program Improvement and Extension of Water and Sanitation Services in Peru (PROCOES)
The National Program for Rural Water and Sanitation (PRONASAR)
Scope:
For the Specific Objective 2
The scope is to a flowchart (including descriptive information about the activities and processes). This flowchart will consider the use of lanes to differentiate the different actors responsible for the processes.
For the Specific Objective 1
The modeling process should be represented under a BPMN (Business Process Model and Notation) approach and reach a level of detail to enable its future to a language called BPEL (Business Process Execution Language) transformation. Through a BPEL XML document, a business analyst is able to represent the logic and associated software components with which you will see related.
Level of Detail Process Model.
Specific Objectives:
2. Develop a flow chart relating to the operational phase (supervision, regulation and assistance) to enable sustainability.
1. Developing a Process Model that integrates all programs that are running MVCS programs related to expanding service coverage of A & S, as well as the repair.
General Objective:
Developing a Process Model Management for optimizing MVCS actions, based on the Implementation and Sustainability of A & S services in rural areas has come and comes running.
Role
Consultant Project Manager
September 2012 to December 2012 (3 months)
"Analyst / Programmer at DESANET"
Web Implementation
Functions:
Web Development / www.pilsen.com / DreamWeaver, Java Script
February 2000 - August 2000 (7 months)
Analyst / Programmer at Research Institute - FIIS - UNI
Functionality developed
Site Navigation and Content
Development Tools
DreamWeaver, Visual Interdev (ASP), SQL Server, Java Script
Technology Used
IIS, OLEDB, COM, MTS (Microsoft)
Solutions
Institutional Portal "FIISNET"
Analysis, Design, Development and Deployment
August 2001 - November 2001 (4 months)
Specialist and Project Manager Logistics Integration Processes Area of Operations at e-Business Interchange Zone (eBIZ SAC)
Functions
System Integration Projects
Integration Processes in the Supply Chain (SCM) Processes administered through the eMarketplace following: b2mining.com & ebizlatin.com:
Mining Consortium Brocal
Mitsui
Ferreyros
Romero Group
Gloria Group
Refinery Cajamarquilla
Mining Consortium Horizonte
Mining Consortium Atacocha
Southern Peru Copper Corporation
Project Implementation and Maintenance Management Systems
Sales / Turnover
Analysis, Design, Development and Implementation of Systems.
Technical Feasibility Assessment
Considerations Functional and Non Functional Requirements that affect software architecture
Platform
HW: AS400 / RS6000 (eServer pSeries), others OS: AIX, Linux, Windows
Native Language used in the Logistics System (Cía. Mining) (ABAP, RPG, CICS, Java, Power Builder, Visual Basic, Other)
ERP's (SAP R3, MIMS, JDEdward, In-House, Other)
Considerations on Complexity Scope
e-Business Interchange Zone (eBIZ SAC)
January 2002 - April 2004 (2 years 4 months)
At present
Project Manager - Management Consulting at SW Consulting eHabich
Enterprise Architecture Consultant and Software Engineering.
Internal Management Functions:
Development Bid on SOA / BPM Suite's
Oracle BPA Suite 11g
SOA Suite's
SOA Suite's FOSS
Oracle SOA Suite 11g
Development Offer Web Solutions (Implemented in eHabich Data Center):
Management Modules
Registration, Control and Monitoring Activities (TimeSheet's) Applied to Centria / Brescia Group
Project Management (PMS)
Enterprise Resource Management (ERP, MRP)
Human Resource Management (HRM)
Marketing Management, Sales and Customer Service (Help Desk, Call Center, CRM, eCommerce)
Modules for Content Management (CMS)
Portal Platform "eHabich-Solution"
System Extensible Object Oriented Portal (XOOPS) FOSS-GPL
Implemented in National Civil Service Authority (SERVIR)
Automation for Process Integration (Variety of Technology Platforms and Architectures)
Quality Management in Architecture and Engineering of Software that are inherent to Solutions.
Development of Methodologies (Solutions + Software)
Development Plans and Strategies
May 2004 - Present (9 years 5 months)
Instructor in Technologies with SOSA/BPM powered by Oracle Middleware Suite at Global Business Solutions Peru (GBS)
Assessment of SOA Skills
Courses of Instruction Provided:
BPM
Oracle BPM 11g: Implement the Process Model (NEW)
Oracle BPM 11g: Modeling (NEW)
BPM with Oracle BPA Suite (24 hrs)
SOA
XML Fundamentals (24 hrs)
Oracle SOA Suite 11g - Build Composite (40 Hrs)
Oracle SOA Suite 11g - Boot Camp (40 hrs)
Oracle SOA Suite 10g R3: Administration (40 hrs)
Service Orchestration with Oracle BPEL (40 hrs)
Oracle SOA Suite 10g: Service Orchestration (40 hrs)
Oracle BPEL Process Manager (24 hrs)
Oracle SOA Project Methodology (24 hrs)
Oracle SOA Essential's (16 hrs)
Organization, Planning & Architectural considerations for SOSA (24 hrs)
Oracle Instructor university to:
AMERICA MOVIL
CREDICHAVIN
CARSA
SONDA
TSNET
GMD
NEXTEL
SUNAT
CAVALI
PACIFIC INSURANCE
INTERBANK
Global Business Solutions Peru(GBS)
Business Consultant (Oracle Partner) authorized to provide the services referred to in Instruction and Certification Program Catalog and Official Courses Oracle University.
August 2006 - Present (7 years 1 month)
CTO / Architect Leader / R + D + I / QoS / QA at SOA Consulting Group - Latin America (SCG - LA)
Tailored programs oriented to Specialization in Software
Best Practices in Software Quality Processes
Code of Practices for the Management of Security of information
International Standards (NTP-ISO/IEC 17799)
Lifecycle Quality in Software Development
ICSM (Incremental Methodology Change in Free Software - MOTS)
International Standard (NTP-ISO/IEC 12207)
Best Practices in Software Engineering
SODA (Oriented Application of Development Services)
Best Practices in Software for Architecture
MDA (Model Driven Architecture)
EDA (Event Driven Architecture)
SOA (Service Oriented Architecture)
CBA (Component-Based Architecture)
Developing a Knowledge Base for SOA Software Projects
MTC - Process Automation Citizen (Inter-Operable Procedures)
Ex-CND - Intergovernmental Information System (Module K PMDE - IDB)
Development of "SOSA Assessment"
Strategic Planning for Information Technology (PETI) for Local Governments.
Design of Policies for strengthening the Software Industry.
Functions in R+D+I
Design and Implementation of Management Programs (Specialized):
Adoption of Enterprise Ontologies for SOA:
ebusiness (XBRL)
eFinance (OFX)
eProcurement (ebXML)
eHealth (HL7)
eLearning (OSID)
eGovernment (GovXML)
Project Management for SOA Adoption
Evaluation
Supervision
Maturation
Implementation
Planning
Project Justification oriented Adoption of Enterprise-Wide SOA:
Strategies
ROI
Investment
September 2006 - Present (7 years)
Working with a wide variety of technologies (VB, VBA,. NET, PHP, J2EE, JSR, WS-*, SOA, etc.)
Review of functional and architectural considerations in our solutions.
Projects: - From the begining (phases of Requirements and Analysis). - Until the Design, Development or Implementation and Project Management
Projects aimed to Improve and integrate Software-based Web Solutions
Many Projects in public and private facilities
Teaching Advanced Topics in Technology (Oracle University)
Continous improvement in Business Process Mangement (BPM)
Services Oriented Architecture (SOA)
SOA is the main support for initiatives of corporative adoption of the Business Process Management (BPM)
SOA has been the result of the growth of software engineering, which includes the use of new Layered Middleware, empowered by Building Block's. It includes repetitive tasks of programatic context