Categorieën: Alle - security - process - engagement - compliance

door Adrian Flather 5 jaren geleden

238

AF Roadmap V1

The roadmap for digital utility development prioritizes security, privacy, and thorough process mapping. It sets strategic objectives, including efficient information management aligned with regulatory standards and the creation of comprehensive tender documents for procurement.

AF Roadmap V1

3: HOW

2: WHERE

1: NOW

Future Business Operating Model

Phased Rollout

Dependancis

Own and operate of Managed Service
Build comms network or utilise existing

Align with IT System Road map

IT Architecture

Staggered Roll out of IT Systems and capabiliies

Stage 3
Stage 2
Stage 1

Planning/ Engagement

Business groups must feed requirements into IT
Separate Change management plan?

Procurement

Develop Tender Documents

Define Technical Specifications
Define all business REQUIREMENTS
Open ended Questions re solution capability

PoC

Land on Guiding Principles

Device Management (Who/ How)
Battery
Battery management (who/ how)
Battery Life?
FOTA
2 - way comms
Mechanical vs Static metrology
Proprietary protocols/ systems vs open
Own network or Managed Service
Build communications network or leverage existing

Other Business REQUIREMENTS

Customer REQUIREMENTS

Future Business Operations Model

OT/ IT REQUIREMENTS

Subtopic
IT Systems spec
Installation Spec
Communications Spec
Meter Spec

Business Case

Digital Utility Roadmap V1

  • Security
  • Privacy
  • Process Audit and mapping
  • More Customer?
  • Strategic objectives ( the Where)
  • Information management: life cycle, retention and disposal- assignment with PROV
  • Development of Tender documentation:
  • open ended questions for procurement. e.g.
  • what functionality does the solution offer in terms of battery management.
  • What functionality does the solution offer in terms of remote bulk and individual configuration change.
  • Describe about intelligence embedded to identify and automatically adjust behaviour dependant on conditions. e.g. adjust transmission frequency at edge of coverage.


  • Operations of the Future - including SLA's

    Contractors
    Vendors
    Business
    Customer
    OT

    The Guts - System identification and requirements

    EDRMS
    HSEQ - the Bridge
    GIS
    PI
    MDMD??
    CRM?
    Focus
    Gentrak

    The guts - Process identification Mapping and Change

    Planning Implications
    Create ' Best Practice' Design and building practices guide to maximize success for digital metering
    Green and Brownfiled developements
    Pricing Submission implications
    Compliance
    HSEQ

    Meter Recycling

    the Bridge

    Information Management - EDRMS

    Life Cycle management - PROV

    Call Centre
    Customer Experience
    SCADA
    Finance
    Asset
    Metering and Connections
    IT

    Main topic

    Phase 2 - Engagement and Guiding Principles

    Customer Journey Mapping
    Customer Persona Developement
    Discover/ Refine/ Create Key Business Guiding Principles
    Own vs Managed Service
    e.g. Opex vs Capex preferences
    e.g. SaaS vs in house capabilities
    e.g. Cloud vs On Prem
    e.g. Asset Framework
    e.g. Data Flow
    Raise Profile of Program
    Engage and bring on the journey
    Identify all parts of the business impaceted by DM
    Change Management plan

    Phase 1 - Define and Establish

    Scope to engage consultant
    Risk?
    PD's for required resources
    PCB ToR
    Governance Structure
    High Level Roadmap
    Define Strategic Objectives - the 'Where'
    Define Scope of program
    Digital Utility Vs Digital Metering Phased Rollout